Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2025 | ENGR - Drainage Structures | Partial Pass | Contractor has been gone for two weeks because the metal building wasn’t delivered on time. Contractor installed the riprap on site. |