Inspection Status: Canceled
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
| Date |
Description |
Inspector |
Results |
Comments |
| 07/02/2025 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Canceled |
|
| 07/23/2025 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Failed |
07/23/25, failed until I receive the picture showing the 20' ground wire and attached to the cage by means of bonding clamp. Picture for each light pole. |
| 08/21/2025 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Not Applicable |
Nothing on plans |
| 08/28/2025 |
SITE - Sign Footer/Setback/Excavation Layout/Rebar |
|
Passed |
Overhead clearance bar, it was forgotten on plans but required due to overhead at the drive through. Do a revision with narrative for the as-built plans . |