Inspection History Details
Inspection Status: Partial Pass
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | For trash and recycling enclosures | Partial Pass | 01/09/26 Wall built to 6' -Reinforcement correct. At end of walls and columns contractor is grouting embed plates from footer to top, just in the first cells that plates are embedded. the rest of wall has 1st lift grouted already. Rebar here will be wet set all the way down. Weep holes punched at bottom of these cells and contractor will send pictures of grout coming out of weep holes for each Refuse Enclosure. OK to grout second lift and embed plates. Vibrate allreinforce cells. |
|
| 02/03/2026 | For trash and recycling enclosures | Partial Pass | 2/3/26 Bollards are placed correct. Okay to pour |
|
| 02/06/2026 | For trash and recycling enclosures | Partial Pass | 2/6/26 Ok to grout wall to the top of wall. Vibrate all grout. Reinforcing correct. Okay to finish wall after grouting |
|
| 02/09/2026 | For trash and recycling enclosures | Partial Pass | 2/9/26 #4 12" OC Mat is correct and forms for 6" floor are good. Floor will drain correct. Okay to pour floor. |
|
| 04/13/2026 | For trash and recycling enclosures | Passed | ||
| 11/13/2025 | For trash and recycling enclosures | Partial Pass | 11/13/25 Reinforcing and dimensions correct for a double TSM refuse enclosure footer. Send picture of expansion joint in the middle of the back wall with number four verts on each side and 3" clearance at wall ends cleaned up of loose dirt. Okay to pour footer with pictures. Build wall to 4' and request pre grout inspection when ready. Request inspections when bollard footers and floor rebar mat Are ready. |
|
| 12/16/2025 | For trash and recycling enclosures | Partial Pass | 12/16/26 Okay to grout first lift. Schedule pre grout inspection for second lift of wall when ready |