Inspection Status: Partial Pass
Inspection History: COT - BASN - Drainage/Basin - Condition Inspection
| Date |
Description |
Inspector |
Results |
Comments |
| 06/18/2025 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Partial Pass |
Drainage basins A and B are finished graded and inlet and outlet weirs are in and correct. Sidewalk scuppers are also correct. Channels leading to basins are correct. Civil contractors are close to 100%. Lanscaping contractors will be installing dg on all planted surfaces… ie on sides of basins. |
| 08/27/2025 |
COT - BASN - Drainage/Basin - Condition Inspection |
|
Re-inspection required |
Concrete spoils, refuse and sediment from disturbed slopes needs to be cleaned out of basins from common area B East of development and DG needs to be installed per plan to stabilize slopes per plan. |