Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2025 | Partial Pass | Footer for wall dimensions are correct. Minimum 18" deep and @ 24" wide. Rebar is more than minimum. They put in 24" oc verts instead of 32" because they misread the section. Going forward they will use 32" verts. Rebar 3" clear of dirt and isolated. 3 longitudinals are in place. Compaction results will be forthcoming via Frank the superintendant. | ||
| 04/01/2025 | Partial Pass | Rebar reinforcing, dimensions and placing is correct for wall footer behind lots 11 to 18. See checklist items for details. Also East wall, adjacent to lots 5 through 10, is ready for grout. First 3 courses of block are in and #4 verts are correct and in place. Masons have been informed of need to vibrate grout. |
||
| 04/07/2025 | Partial Pass | Footer is located east of lots 1 through 4 Ready to pour footer |
||
| 04/09/2025 | Partial Pass | Screen wall east of lots 5-10 is correct. Proceed to grout on retention wall west of lots 11 through 18. see. See Checklist items for details. |
||
| Partial Pass | See checklist for details. | |||
| 04/22/2025 | Partial Pass | Retaining wall west of lots 11-18 has bond beam in place at top and is ready for grout. Retailing wall east of lots 1-3 has bond beam at top of grade in place. Horizontal reinforcement is correct. I will need to see bond beam at top of wall before it is grouted. Screen walls are not ready. Footer is incorrect for 5’ walls. Frank has diagram to fix. These footers need to be reinspected. |
||
| 04/24/2025 | Not Ready | Screen walls footer not ready. Currently width is 13”. For 4’-8” high 16” is required. For 5’-4” 18” is required. | ||
| 04/28/2025 | Partial Pass | Screenwall footers in checklist ready to be poured. | ||
| 05/01/2025 | Partial Pass | 5/1/25 Screen walls. See checklist items. | ||
| 05/06/2025 | Partial Pass | See checklist items. | ||
| 05/07/2025 | Partial Pass | 5/7/25 Footings for screen walls North of Lot 1 and South of Lot 4 are ready to be poured. Dimensions and reinforcing is correct. Call in inspection for these walls when half way built and ready for grout. Screen wall to the south of lot 11 is correct and can be finished as well as north of lot 18. |
||
| 05/15/2025 | Partial Pass | Engineer needs to sign off on wall as built along lot 10. Footer and 1St course ore built with screen wall detail instead of retaining wall. Wall holds up about 2 ft of grade. See details in checklist |
||
| 05/21/2025 | Partial Pass | Screen wall north of lot 1 is 4’ high and ready for grout. Reinforcing correct. Vibrate all grouted cells. Screen wall north of lot 5 1 is 4’ high and ready for grout. Reinforcing correct. Vibrate all grouted cells. Screen Wall south of lot 10. Footing good and reinforcement spacing correct. Okay to build up the first 4 ft. then call in pre grout inspection. |
||
| 05/27/2025 | Partial Pass | Screen wall south of lot 10 is correct and okay to grout. Vibrate all grouted cells. |