Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | NOI or NDC, SWPPP Book, Board And wattle will be in place for Storm Water Initial Inspection. Schedule this inspection when ready. Inspections needed for DP: Sidewalk/flatwork-schedule this for Curb ramps and reinforcing/dowels Site Consultation Striping Signage Engineering Final |