Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 10/21/2025 |
|
|
Partial Pass |
Contractors good to pour sidewalk along the west end of the building and the north end of the building 200 lineal feet |
| 10/29/2025 |
|
|
Partial Pass |
contractors good to pour the sidewalk on the east end of the building and the bollards on the north east corner of the building. And pour the footers for the canopy in the courtyard. |
| 11/05/2025 |
|
|
Partial Pass |
Contractor Kapoor, the slab for the bike racks on the south east corner |
| 11/12/2025 |
|
|
Partial Pass |
contractor is good to pour the sidewalks in the patio area and on the west side of the building is good to pour the sidewalk area there also. Plus, he has some handrail posted that are good to be to pour |
| 11/18/2025 |
|
|
Passed |
Sidewalks in front of both southern most units are formed correctly with appropriate slopes. Okay to pour. |