Inspection Status: Partial Pass
Inspection History: Grading Progress ENGR
| Date |
Description |
Inspector |
Results |
Comments |
| 02/19/2026 |
Grading Progress ENGR |
|
Partial Pass |
Contractors good to pour the east ramp of the building |
| 02/25/2026 |
Grading Progress ENGR |
|
Partial Pass |
contractors good to pour the west ramp into the building truck ramp. |
| 04/13/2026 |
Grading Progress ENGR |
|
Partial Pass |
gradient the channel on the north side of the building, getting ready for grouted rip wrap |
| 04/29/2026 |
Grading Progress ENGR |
|
Partial Pass |
contractors grading on the south east quadrant for curb. Everything looks good at this time. |
| 05/12/2026 |
Grading Progress ENGR |
|
Partial Pass |
greeting for the curb around the building everything looks good. Good to pour. |