Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2025 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
All wattle needs to be properly staked. All trash needs to be cleaned up. Port A Jon’s need to be properly staked down. Dumpster should be in a location so that if anything leaks out it does not impact the integrity of the basin. Basin is being impacted by construction and should be maintained to hold what is the required amount of water. |