Inspection History Details
Inspection Status: Not Ready
Inspection History: For trash and recycling enclosures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2026 | For trash and recycling enclosures | Not Ready | ||
| 01/26/2026 | For trash and recycling enclosures | Partial Pass | Contractors good to pour the footer for the trash enclosure | |
| 01/30/2026 | For trash and recycling enclosures | Partial Pass | 1/30/26 Pre-grout inspection at first lift. I explained to contractor he could build the wall all the way up to 6 feet with one pre grout inspection. To do this Contractor will punch weep holes in all reinforced cells at footer. He also put in a bond beam at top course of wall. He will request pre-grout inspection for us to look at Bond beam and reinforcing. OK to finish building wall... |
|
| 02/09/2026 | For trash and recycling enclosures | Partial Pass | Contractor is, good to pour the floor for the trash enclosure |