Permit: TD-DEV-0323-00162

Parcel: 132130260


Addresses:

1501 E METRIC PL

Inspection Status: Not Ready

Inspection History: For trash and recycling enclosures

Date Description Inspector Results Comments
01/22/2026 For trash and recycling enclosures Not Ready
01/26/2026 For trash and recycling enclosures Partial Pass Contractors good to pour the footer for the trash enclosure
01/30/2026 For trash and recycling enclosures Partial Pass 1/30/26
Pre-grout inspection at first lift. I explained to contractor he could build the wall all the way up to 6 feet with one pre grout inspection. To do this Contractor will punch weep holes in all reinforced cells at footer. He also put in a bond beam at top course of wall. He will request pre-grout inspection for us to look at Bond beam and reinforcing. OK to finish building wall...
02/09/2026 For trash and recycling enclosures Partial Pass Contractor is, good to pour the floor for the trash enclosure