Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TD-DEV-0323-00162

Parcel: 132130260


Addresses:

1501 E METRIC PL

Inspection Status: Not Ready

Inspection History

Date Description Inspector Results Comments
02/13/2026 Not Ready 2/13/26
Truck Ramp at Loading dock.
Toe down at top of ramp edge not in place with#4 continuous
Sump pump forms missing angle.
Reschedule when ready
03/19/2026 Partial Pass forming up the sidewalk in front of the building on the east side good to pour
04/07/2026 Partial Pass contact is good too pour the entryway slab on the north side of the building and the stairways
04/29/2026 Partial Pass warming up for the good eye channel on the west side of the building
05/12/2026 Partial Pass good to put the slab in front of the trash enclosure
06/10/2025 Not Ready No one on site, job is shut down.