Inspection History Details
Inspection Status: Not Ready
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2026 | Not Ready | 2/13/26 Truck Ramp at Loading dock. Toe down at top of ramp edge not in place with#4 continuous Sump pump forms missing angle. Reschedule when ready |
||
| 03/19/2026 | Partial Pass | forming up the sidewalk in front of the building on the east side good to pour | ||
| 04/07/2026 | Partial Pass | contact is good too pour the entryway slab on the north side of the building and the stairways | ||
| 04/29/2026 | Partial Pass | warming up for the good eye channel on the west side of the building | ||
| 05/12/2026 | Partial Pass | good to put the slab in front of the trash enclosure | ||
| 06/10/2025 | Not Ready | No one on site, job is shut down. |