Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: TD-DEV-0323-00162

Parcel: 132130260


Addresses:

1501 E METRIC PL

Inspection Status: Not Ready

Inspection History

Date Description Inspector Results Comments
02/13/2026 Not Ready 2/13/26
Truck Ramp at Loading dock.
Toe down at top of ramp edge not in place with#4 continuous
Sump pump forms missing angle.
Reschedule when ready
03/19/2026 Partial Pass forming up the sidewalk in front of the building on the east side good to pour
04/07/2026 Partial Pass contact is good too pour the entryway slab on the north side of the building and the stairways
04/29/2026 Partial Pass warming up for the good eye channel on the west side of the building
05/12/2026 Partial Pass good to put the slab in front of the trash enclosure
06/10/2025 Not Ready No one on site, job is shut down.
09/16/2026 Partial Pass Okay to pour sidewalk south of building.