Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 03/19/2026 |
|
|
Partial Pass |
Forming up catch basins on the east side of the building by the channel |
| 03/30/2026 |
|
|
Not Ready |
Called and left a message at 7:00 for Patrik, phone number: (520) 307-4035. per inspection note to notify that today is a City Holiday and since the system allowed the request, that would inspect as a courtesy. I received a call back stating that this was a wrong number. Request re-inspection for 03-31-26 |
| 12/17/2025 |
|
|
Partial Pass |
Contractor and I had a conversation about the drainage pipe on the west side of the project. I am formed him and that is OK. Connect the two pipes and use a dot color on them. |