Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2026 | ENGR - Drainage Structures | Partial Pass | contractor dowels into the existing head wall at 1 foot centers looks good. They’re gonna continue to form that up and pour on Monday. |