Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2026 | SITE - Stormwater Setup and Controls | Passed | 3/25/26 SWWWP BMP's are in and are to plan. Inlets are protected. East phase 9 Area's 1 and 2 will be protected with BMP's later when work starts in those Areas. Wattle will be adjusted as discussed with contractors. Construction Entrance on Alvernonon in place. Sign board in place and swift book in place and will be accessible. NOI issued. Responsible party on SWWWP sign board with contact information. OK to start work |