Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | ENGR Engineering Final | Partial Pass | Site is mostly complete. Still need some cleanup work, install a kiosk and signs, and confirm all ground anchors. SWPPP controls are no longer needed, ADEQ permit may be closed. Recall Engineering Final once final punch list items are complete and park is safe for public access. |