Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting held onsite with Andrei from Mammoth Sports. Necessary inspections are listed below: Drainage pipe - for bedding and pipe inspection of storm drain pipe Sidewalk/Flatwork - for rebar inspection of the concrete pad Irrigation - for any irrigation related trenching or capping Site Consultation - for general questions Zoning Final - once project it complete to verify compliance to zoning regulations Engineering Final - once project is complete to verify CofO readiness |