Inspection History Details
Inspection Status: Scheduled
Inspection History: SITE - Stormwater Follow-up
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| SITE - Stormwater Follow-up | Scheduled | |||
| 07/21/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | Dirt has spilled into the storm drain structure closest to the trailer, needs to be cleaned out - see attached photo. Requested actions from previous inspection have been addressed: Track-out rock has been swapped for angular. Wattle in place around perimeter. Designated concrete washout has been installed. SWPPP book and plans are on site. |
|
| 08/05/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No concern with the storm water biweekly. But there is an open trench that needs to be secure. Contractor needs to fence it off or burn it off for safety. | |
| 10/27/2025 | SITE - Stormwater Follow-up | Passed | 10/27/25 - Site is being maintained well, perimeter controls are functioning properly. | |
| 11/10/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time everything looks good |