Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
06/15/2026 ENGR Engineering Final Partial Pass 6/15/26 - .
Remaining items to finish include: Landscaping and ground cover, correct NE basin outlet elevation, finish SW basin outlet structure/pipe, install EV infrastructure, install handrail at north stairwell exit, ensure grade slopes away from building on East side.