Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2026 | COT - LCPL - Sewer | Not Ready | 3/31/26 PreCon meeting: 1. Spoke with Ricky and his Sub Contractor regarding Sewer lateral and BCS connection. They will have traffic control in place for 24 hours and will have Pima County inspect saddle tap and street side sewer line. 2. No Backwater valve on plans. Also need to make sure detectable marking tape is used before backfilling. |
|
| 04/15/2026 | COT - LCPL - Sewer | Partial Pass | 4-15-26: HCS connection located on the south side of site near sidewalk verified under test. Okay to backfill progress areas using shading materials. | |
| 04/21/2026 | COT - LCPL - Sewer | Passed | 4/21/26 passed |