Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2025 | BULD - Electrical Clearance | Partial Pass | Partial fr the 80A meter adapter - DGL Clearance was called into TEP at 11:30 am Pending solar final |
|
| 09/18/2025 | BULD - Electrical Clearance | Passed | 9/18/25 TEP CLEARANCE: DGC |
|
| 09/18/2025 | BULD - Electrical Clearance | Re-inspection required | 9/18/25 Missing pictures of Main panel dead front, we need to see backfeed breaker location and labels on the inside. |