Permit: TC-SOL-0425-00561

Parcel: 140060110


Addresses:

5312 S LANSING SV

Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
06/04/2025 BULD - Electrical Clearance Partial Pass Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover - pending solar
07/09/2025 BULD - Electrical Clearance Partial Pass Partial for the Tesla meter switch - DGL Clearance to TEP was called at 10:15am
Pending solar and finals
07/11/2025 BULD - Electrical Clearance Passed Approved with pics - DGC/BAT Clearance to TEP is required for the solar meter