Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance to TEP is required for the cutover - pending solar | |
| 07/09/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance to TEP was called at 10:15am Pending solar and finals |
|
| 07/11/2025 | BULD - Electrical Clearance | Passed | Approved with pics - DGC/BAT Clearance to TEP is required for the solar meter |