Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/21/2026 |
RSBU - Building Final |
|
Not Ready |
No one on site |
| 01/22/2026 |
RSBU - Building Final |
|
Not Ready |
please install three screws at each joint for the flu pipe, including the top of the water heater and the double wall at the ceiling and remove metal metallic tape. Supply gas line has several elbows in the drop place to wall mounts at one at the top and one at the bottom so that the pipe is not easily twisted. |
| 02/19/2026 |
RSBU - Building Final |
|
Passed |
All corrections were made. 2/19/2026 |