Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
07/08/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 1. Seal all top plate penetrations with fire caulk or fire putty.
2. Add blocking for future grab bars in bathroom
3. Cannot have insulation up before intermediates are passed. Remove insulation for re-inspection.
4. Secure all plumbing lines and have under test.
5. Wrap hose bib copper in 10 mil tape before stucco.
6. Weep creed needs to be Minimum of 4" from dirt or 2" from concrete.
7. Main water line not connected.
8. HVAC line set have not been set yet, condenser pad installed yet.
07/10/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed