Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
|
BULD - Electrical Clearance |
|
Canceled |
cancelled |
| 02/26/2025 |
BULD - Electrical Clearance |
|
Partial Pass |
2/26/25 approval for TEP INCR for cutover |
| 03/13/2025 |
BULD - Electrical Clearance |
|
Passed |
passed final 3/13/25 CLEARANCE DGC |
| 05/21/2025 |
BULD - Electrical Clearance |
|
Not Ready |
Not ready. Field inspection was a de rate. Plans call for a MSA 2p40A. Revise set of plans to match field inspection. 5/21/2025 |
| 06/04/2025 |
BULD - Electrical Clearance |
|
Passed |
Approved solar - DGC Clearance to TEP is required for the solar meter |