Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2025 | BULD - Electrical Clearance | Passed | 6.25.25 Solar system is installed per plans. Proper conductors, bracing, hardware and grounding used throughout. Labels present every ten ft on conduit. Lower portion of system is AC not DC, Inverters are on roof so no DC conduit labels required below roof line and therefore are not present. |