Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-1125-05359

Parcel: 116261440

Inspection Status: Not Ready

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
11/13/2025 RSBU - Building Final  Not Ready Not ready. Provide 18" of copper before transition to pex at main water line, water heater and rear hose bib. Secure loose angle stops. Insulate hot water lines that are running parallel with cold line. Seal all top penetrations with fire foam. Provide hammer arrestors at laundry room, hot line for dishwasher and refrigerator. Provide an ice maker outlet box for refrigerator. 11/13/2024
11/21/2025 RSBU - Building Final  Re-inspection required 11-21-25: missing hammer arrestor at refrigerator. The copper line in wall behind for the water heater requires a total of 18" of copper before it transitions to pex. Also, R3 insulation is required for the hot water leg of the water heater. Reschedule inspection when ready.
11/26/2025 RSBU - Building Final  Passed 11.26.25
Approved