Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/13/2026 |
RSBU - Building Final |
|
Re-inspection required |
3-13-26: add arch-fault breakers at each habitable areas to include, kitchens, living rooms, hallways, and bedrooms. Paint all exterior pvc & abs on rooftop, provide access to water heater, lower thermostat to 48" o.c., install vacuum breaker at hosebib, and a hammer arrestors for dishwasher & laundry, gfci required for laundry room, exterior receptacles must be gfci and receptacles must be "weather resistance " type. Please schedule all finals at your convenience. |
| 03/25/2026 |
RSBU - Building Final |
|
Passed |
3-25-26: building final approved. |
| 03/25/2026 |
RSBU - Building Final |
|
Re-inspection required |
3-25-26: unable to open gate. |