Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-RES-1124-06398
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 5-21-25, firefoam all penetrations, an RFI is required for replacing hard duct to flex together with another RFI for replacing 2x10 rafters on west side of of home and provide details as to how they are to be cantilevered onto existing load bearing cmu wall. Also, a 10' clearance is required between fresh air and exhaust. A 12" clearance between PEX and can lights are required. Either relocate PEX to allow for the 12" clearance or block using OSB, plywood, 2x4's or drywall. Fur out mudsill must be treated wood and anchored to slab. | |
| 07/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |