Inspection Status: Passed

Inspection History: COT - RSBU - Exterior/Interior Clips/Sheathing/Framing

Date Description Inspector Results Comments
01/07/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 01/07/2026
Corrections made to 12/29/25 inspection.
12/29/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Partial Pass 12-29-25: partial pass-pending 1/2" anchor bolts at several locations. Anchor bolts must be installed in the middle third of the plate; within 12" of the end of each plate & spaced no further than 6' apart. Missing 3/8" x 5" lag bolts at each connection-see ledger detail for more. This items will be checked at intermediates-okay to dry-in roof and continue with construction without covering the mentioned listed items.