Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | BULD - Electrical Clearance | Re-inspection required | ||
| 06/05/2026 | BULD - Electrical Clearance | Re-inspection required | 6.5.26 Corrections to panel were not made |
|
| 06/18/2026 | BULD - Electrical Clearance | Passed | ||
| 12/11/2025 | BULD - Electrical Clearance | Re-inspection required | 12-11-25: this is a fire damaged house and because many of the existing walls were exposed, therefore, a full set up plans are now required showing work to be done. Submit the plans to city for review/approval. Note: current set of plans indicate to bring house up to code and to use existing plumbing. However, it appears that new pex is being installed throughout, walls are being furred out and windows have already been replaced. Plans for all work are required. |