Permit: TC-RES-1025-04939

Parcel: 137102000


Addresses:

5534 S CANADA DR

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
02/19/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 2/19/26: all existing duct work has been removed and replaced with flexible duct (manual J and manual D calculations required for replacement of HVAC equipment and associated ducting system), flexible ducts shall be supported 4' o.c and shall have no more than 1/2" drop per foot. Flexible ducts shall be properly secured at all supply and return registers (duct sealant required at all connections, flexible ducts shall be correctly installed at registers, plenum box has not been installed for air distribution.revision required prior to continuation of project, kitchen hood has been removed and shall be replaced. Permit status is currently needs resubmittal. This will prevent any further inspection from being called in.
05/29/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 5/29/26: all grounds need to be made up at metallic boxes, missing receptacles at kitchen counter top (12") in width, thermostat height shall be no higher than 48" AFF, exhaust fan missing in bathrooms, receptacle missing in bedroom #3 (spacing), missing exterior light at storage area, no access to laundry room.
06/04/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 5.4.26
Refer to previous notes and callouts
07/02/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
12/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12-11-25: this is a fire damaged house and because many of the existing walls were exposed, therefore, a full set up plans are now required showing work to be done. Submit the plans to city for review/approval.
Note: current set of plans indicate to bring house up to code and to use existing plumbing. However, it appears that new pex is being installed throughout, walls are being furred out and windows have already been replaced. Plans for all work are required.
12/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12-11-25: this is a fire damaged house and because many of the existing walls were exposed, therefore, a full set up plans are now required showing work to be done. Submit the plans to city for review/approval.
Note: current set of plans indicate to bring house up to code and to use existing plumbing. However, it appears that new pex is being installed throughout, walls are being furred out and windows have already been replaced. Plans for all work are required.
12/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12/30/25: revised set of plans has been submitted (electrical plan is missing panel schedule with circuit number and wire size, plumbing plan missing in-wall schematic), all penetrations at top plate must be sealed, all existing duct work must be properly sealed, plumbing must be properly supported and all domestic hot water lines 3/4" or larger require R-3 insulation