Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2026 | RSBU - Building Final | Not Ready | Receptacles to the left at door entry have open grounds. All counter top receptacles have to be gfci protected. Provide 2 circuit at kitchen counter top. Provide gfci receptacles under sink, washer, and bathroom areas. Coat all exterior plastic pipes. Provide arc fault breakers at all living space. Ensure to schedule all other inspections pending prior to finals. 3/6/2026 | |
| 04/17/2026 | RSBU - Building Final | Passed | 4/17/25 All corrections made. |