Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-1024-05976

Parcel: 137054440


Addresses:

766 W NEBRASKA ST

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 7/21/25: Not ready for inspection (wiring incomplete, spacing non code compliance, NM cable must be properly secured 12" from box at all locations, Pex lines require support on vertical runs throughout, DWV must be secured midway in wall, seal all penetrations through top plate and vapor barrier, lath must be installed for intermediate inspection). STOPPED INSPECTION MORE ITEMS MAY BE ADDED, DWV under test.
09/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 9.2.2025
Secure water and ABS pipes midway and add Boca plates, firefoam the top plates throughout, smoke alarms missing in bedroom and main room, secure electrical lines near panel, missing receptacle at kitchen counter, receptacles need to be made up in box, missing mechanical equipment. Missing anchor bolts every 48" OC & within 12" of edge on west bearing wall, shot pins required 6" from edge and 2x for greater than 12" and every 32" on center per plan.
11/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11.20.2025
All corrections made to prior inspection. Added fire foam to top plate penetrations, braced register ducts, shower tested for leaks, lowered thermostat to 48", ensured receptacle spacing at kitchen counter top. Okay to proceed with construction.