Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2026 | RSBU - Building Final | Re-inspection required | Inspection Date: 01/15/2026 Status: STOPPED INSPECTION – Additional items may be added Hot and neutral reversed at the bathroom receptacle in the north bedroom, Hot and neutral reversed at the north bedroom receptacle, Receptacle spacing throughout the dwelling does not comply with NEC requirements, Bathroom receptacle at the south unit must be GFCI protected, All exterior receptacles must be GFCI protected and WR-rated. Sub-panel could not be located at the time of inspection, Kitchen receptacle spacing must comply with NEC requirements and be GFCI protected, Receptacle located beneath the kitchen sink must be GFCI protected and provided with an appropriate cover, All exterior junction boxes must be rated for exterior use and provided with approved exterior-rated covers, Existing home has been re-wired and re-plumbed; a revision to the permit is required, Water heater was replaced without an approved permit, HVAC system was replaced without an approved permit, All mini-split systems installed are from Mexico; documentation from a third-party testing agency is required to verify compliance with UL listing requirements for equipment installed in the United States, Refrigerant lines for mini-split systems must be UV protected, Covered framing members must be exposed for inspection to verify code compliance, Laundry room framing is not code compliant and must be corrected, Water closet clearance requirements are not met at the north bedroom bathroom, Piping used at the north bedroom bathroom lavatory is not code compliant, Piping beneath the kitchen sink must be properly connected to ensure appropriate discharge, Exterior plastic piping must be properly supported and protected from UV exposure, DWV system must be tested for leaks, and proper burial depth must be verified, Laundry room window must be replaced with tempered glass, as it is located within 24 inches of the door,All entrances must comply with the City of Tucson all-inclusive ordinances. |
|
| 01/20/2026 | RSBU - Building Final | Re-inspection required | Hot and neutral conductors are reversed at the north bedroom receptacle and the bathroom receptacle serving the north bedroom. Receptacle spacing throughout the dwelling, including the kitchen, does not comply with NEC requirements; kitchen and bathroom receptacles must be GFCI protected. The south unit bathroom receptacle must be GFCI protected. All exterior receptacles must be GFCI protected, WR-rated, and installed in approved exterior-rated boxes with proper covers. The receptacle located beneath the kitchen sink must be GFCI protected and provided with an appropriate cover. The electrical sub-panel could not be located at the time of inspection. The existing home has been rewired and replumbed; a permit revision is required. The water heater and HVAC system were replaced without approved permits. All installed mini-split systems are manufactured in Mexico; third-party documentation is required to verify UL compliance for U.S. installation. Mini-split refrigerant lines must be UV protected. Covered framing members must be exposed for inspection to verify code compliance. Laundry room framing is not code compliant and must be corrected. Water closet clearance requirements are not met in the north bedroom bathroom. Piping at the north bedroom bathroom lavatory is not code compliant. Piping beneath the kitchen sink must be properly connected to ensure proper discharge. Exterior plastic piping must be adequately supported and protected from UV exposure. The DWV system must be tested for leaks, and proper burial depth must be verified. The laundry room window must be replaced with tempered glass due to its proximity (within 24 inches) to the door. Windows used for egress must comply with ICC requirements. All partition walls must be fire-rated as required. The carport must be removed due to setback requirements. All entrances must comply with City of Tucson all-inclusive ordinance requirements. |
|
| 07/02/2026 | RSBU - Building Final | Passed |