Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Inspection Status: Re-inspection required (with fee)

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
02/17/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee)
02/17/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee)
03/10/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/10/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled
12/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 12/23/25: All construction has been completed prior to conducting any on-site inspection. Framing members shall be exposed throughout the home to verify code compliance and adherence to approved plans (this will include wall framing and ceiling framing), We shall verify holdown location on sill plate to very proper anchorage, all mechanical clips shall be exposed to verify compliance, we shall require verification of trench depth for electrical underground and plumbing pipes such as sewer lines, raceway for subpanel shall be ran underground from current location of main panel (piping shall be properly secure and meet the requirements for burial depth), AFCI and GFCI required throughout unit 1 and unit 2, multiple branch circuits missing per approved plans, receptacle spacing does not meet code, smoke alarms must be interconnected, footings and slab must be exposed around perimeter to verify proper depth and size, x-ray will be required to ensure reinforcement installed in footings, in-wall rough-ins were never called ( we shall verify all wiring/pluming/mechanical in wall), mini splits must be listed and approved for US application, receptacles required at front and rear of home, light fixtures shall meet Pima county outdoor light ordinance, All requirements of the All inclusive home design shall be met. MORE ITEMS MAY BE ADDED AT TIME OF RE-INSPECTION