Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2026 | COT - RSPL - Rough Soil | Re-inspection required | 2/17/26: 2-way cleanout missing per plans, rough soil/plumbing underground must be tested prior to backfill, rough soil must be 12" below grade, sleeve required where plumbing passed through footing, plumbing in contact with concrete shall be wrapped with insulation, rough soil shall be 3" outside new addition slab, call re-inspection on plumbing underground prior to inspection for excavation/rebar/zoning | |
| 02/20/2026 | COT - RSPL - Rough Soil | Re-inspection required (with fee) | 2/20/26 Piping still not 12" below grade | |
| 02/24/2026 | COT - RSPL - Rough Soil | Passed | ||
| 12/10/2025 | COT - RSPL - Rough Soil | Re-inspection required | 1.Plumbing not under test. 2. Missing clean out west end after the elbow. 3. No standpipe for washer, can be done at intermediate inspection. |