Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2026 | COT - RSBU - Preslab | Re-inspection required | 2/17/26: 2-way cleanout missing per plans, rough soil/plumbing underground must be tested prior to backfill, rough soil must be 12" below grade, sleeve required where plumbing passed through footing, plumbing in contact with concrete shall be wrapped with insulation, rough soil shall be 3" outside new addition slab, call re-inspection on plumbing underground prior to inspection for excavation/rebar/zoning, footing not per approved plans. | |
| 03/12/2026 | COT - RSBU - Preslab | Re-inspection required | 3/12/26:Revision required for changes made to framing members( plans call for 2x6 exterior walls), 2x solid blocking required at roof, exterior sheathing missing nailing throughout (6"/12" required), anchor bolts must be spaced no more than 6" o.c and shall be no more than 12" from edge and no less than 3.5" from edge (must be installed in middle third of sill plate). Weep screed shall be 2" above concrete landing at entry and landing shall be corrected. | |
| 07/07/2026 | COT - RSBU - Preslab | Passed | 07/07/2026 Corrections made to prior inspection, footing was verified and revision submitted. |
|
| 12/10/2025 | COT - RSBU - Preslab | Not Ready | Homeowner needed a plumbing underground for laundry. I have added the rough soil inspection and have annotated my notes in there. For the Preslab there is a footing that needs to be inspected, please see page 2. |