Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-RES-0923-08235

Parcel: 125072080


Addresses:

530 N WILSON AV

Inspection Status: Passed

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
05/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Duplicate inspection. 5/8/2025
11/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Secure gas lines in place. Pex lines need to be 12" away from any can lights. Secure pex lines every 32" horizontal. Block registers on three sides. Plans call for double switch in laundry room. Missing 220 for dryer, missing exhaust fan in laundry room. Provide transition glue from abs pipe to pvc in laundry room for grey water. STOPPED INSPECTION. Too many errors. Other items may occur. 11/27/2024
11/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Secure gas lines in place. Pex lines need to be 12" away from any can lights. Secure pex lines every 32" horizontal. Block registers on three sides. Plans call for double switch in laundry room. Missing 220 for dryer, missing exhaust fan in laundry room. Provide transition glue from abs pipe to pvc in laundry room for grey water. STOPPED INSPECTION. Too many errors. Other items may occur. 11/27/2024
12/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Partial pass. MEP'S approved. Okay to proceed. Pending as built drawings. 12/10/2024