Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
Duplicate inspection. 5/8/2025 |
| 11/27/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Secure gas lines in place. Pex lines need to be 12" away from any can lights. Secure pex lines every 32" horizontal. Block registers on three sides. Plans call for double switch in laundry room. Missing 220 for dryer, missing exhaust fan in laundry room. Provide transition glue from abs pipe to pvc in laundry room for grey water. STOPPED INSPECTION. Too many errors. Other items may occur. 11/27/2024 |
| 11/27/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Secure gas lines in place. Pex lines need to be 12" away from any can lights. Secure pex lines every 32" horizontal. Block registers on three sides. Plans call for double switch in laundry room. Missing 220 for dryer, missing exhaust fan in laundry room. Provide transition glue from abs pipe to pvc in laundry room for grey water. STOPPED INSPECTION. Too many errors. Other items may occur. 11/27/2024 |
| 12/10/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
Partial pass. MEP'S approved. Okay to proceed. Pending as built drawings. 12/10/2024 |