Inspection Status: Partial Pass

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
11/27/2023 BULD - Electrical Clearance Partial Pass 11/27/23 partial clearance INCR for panel upgrade
11/30/2023 BULD - Electrical Clearance Re-inspection required Called multiple times and left voicemails. Received a call back and was told it was the wrong number. Got to the site and gates were locked. Dogs are on site. Provide access to the site. 11/30/2023
12/04/2023 BULD - Electrical Clearance Canceled
12/08/2023 BULD - Electrical Clearance Passed Approved solar install, DGC Clearance to TEP is required for the solar meter