Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 11/27/2023 |
BULD - Electrical Clearance |
|
Partial Pass |
11/27/23 partial clearance INCR for panel upgrade |
| 11/30/2023 |
BULD - Electrical Clearance |
|
Re-inspection required |
Called multiple times and left voicemails. Received a call back and was told it was the wrong number. Got to the site and gates were locked. Dogs are on site. Provide access to the site. 11/30/2023 |
| 12/04/2023 |
BULD - Electrical Clearance |
|
Canceled |
|
| 12/08/2023 |
BULD - Electrical Clearance |
|
Passed |