Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | ||
| 10/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | 1. All The flex ductwork converging above the water heater is crushed and improperly installed, restricting airflow. Please reroute and install the ductwork correctly to ensure proper design airflow. 2. Water heater is not installed, can check at final at your own risk. Highly recommend installing at intermediate. |
|
| 10/27/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 10/27/25 1. Same issues as previous inspection. Current duct size also do not match plans. 2. Missing register sizes and CFM flow rates for register 3. Missing manual J calculations. 4. Next inspection may result in Reinspection fee. |
|
| 10/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.29.25 Corrections made, contractor is opting for wh at final. |