Inspection Status: Re-inspection required

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
04/25/2025 BULD - Electrical Clearance Re-inspection required 4/25/25
Called and left voicemail, no answer.
05/01/2025 BULD - Electrical Clearance Re-inspection required 05/01/25
Called and left voicemail, no answer.
05/09/2025 BULD - Electrical Clearance Re-inspection required 05/09/25
1. Bond bushings required throughout;
2. photovoltaic labels needed on conduit rooftop;
3. LABEL Needed at main service panel, DEPICTING A BUILDING WITH A ROOF THAT READS "SOLAR PV SYSTEM IS EQUIPPED WITH RAPID SHUTDOWN", AS WELL AS, "TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY" PER 2017 NEC 690.56(C)(1)(A)
06/23/2025 BULD - Electrical Clearance Passed Approved all items addressed, DGC Clearance to TEP is required (separate service panel upgrades is required)