Inspection Status: Re-inspection required

Inspection History: RSBU - Building Final 

Date Description Inspector Results Comments
04/25/2025 RSBU - Building Final  Re-inspection required 4/25/25
Called and left voicemail, no answer.
05/02/2025 RSBU - Building Final  Re-inspection required 05/02/2025
Missing plans. Please submit plans for review, and request clearance inspection after plans have been reviewed and stamped by the City.
05/09/2025 RSBU - Building Final  Re-inspection required 05/09/25
1. Bond bushings required throughout;
2. photovoltaic labels needed on conduit rooftop;
3. LABEL Needed at main service panel, DEPICTING A BUILDING WITH A ROOF THAT READS "SOLAR PV SYSTEM IS EQUIPPED WITH RAPID SHUTDOWN", AS WELL AS, "TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY" PER 2017 NEC 690.56(C)(1)(A)
06/23/2025 RSBU - Building Final  Passed