Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Not Ready | Provide ground screws at all metal boxes along with grommets. Provide blocking at dead space behind shower. Secure ABS mod way. Provide DWV test. Provide cleanouts per plan. Provide blocking at register in bathroom and living room. Secure loose pex lines. Remove drywall in laundry room to verify stand pipe. Fire foam all top penetrations. Provide run and shower test. Support and secure horizontal abs at every 4’. Add nail plates at marked areas. Move smoky in first bedroom over. To close to wall. 4/30/2026 | |
| 05/04/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5.4.26 Corrections made and verified. Proceed. |