Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/21/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
10-21-24, DWV not under test and approved stamped plans were not on site. Customer asked to reschedule when ready. |
| 11/25/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Partial Pass |
11/25/24: PARTIAL PASS: Electrical and plumbing in bedrooms, bathroom, living room, dining room, and kitchen are complete. Missing roof penetration and conduit for A/C unit on roof and missing gas line in kitchen for stove, Gasline needs to be pressure tested to 15psi before Southwest Gas Company will install new meter. Okay to insulate and install drywall in the following areas: bedroom walls and ceilings, living room and dining room walls and ceilings, and bathroom walls and ceiling. Cannot install ceiling and walls in kitchen or hallway until missing items are corrected. |
| 12/16/2024 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
12/16/24: Gas line is under 15 psi of air pressure with no leaks. Electrical has been properly installed through roof for a/c unit. Okay to proceed with other work. |