Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: Pool/Spa - Pre-Gunite
| Date |
Description |
Inspector |
Results |
Comments |
| 09/20/2023 |
Pool/Spa - Pre-Gunite |
|
Passed |
Continuous ground wire is ran from pool pump location around pool deck and connected at 4 locations on the rebar reinforcement. Rebar reinforcement is properly installed and wired off with concrete dobbies holding it up off the ground. Electrical conduit for pool light is in place within the trench. Okay to apply gunite to pool bottom and sides. |