Inspection Status: Not Ready
Inspection History: COT - RSEL - Electrical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/12/2023 |
COT - RSEL - Electrical Final |
|
Not Ready |
Not ready. Electrical wires exposed to weather need to be replaced and in conduit. Wires in panel need to be landed. Add cover plates to knock out. Water and gas lines need to be bonded. Provide torque specs on torque lugs along with witness marks. 7/12/2023 |
| 07/17/2023 |
COT - RSEL - Electrical Final |
|
Passed |
Approved - RECN Clearance to TEP is required for the reconnection (meter #154635663) |