Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 6-9-26: add straps to DWV at 4' intervals, add stud shoe to 2x6 studs at south lavatory wall, add Boca plate at DWV where closer than 1 1/4" from edges of studs, submit a revision for mechanical-plans show a mini-split and flex was installed, a 12" clearance between pex & can lights is required- block using osb, plywood, drywall or relocate pex lines allowing for 1' clearance, hot pex lines must be insulated with R3, open knockouts at above ceiling junction boxes, add plastic bushing to protect awg wires stemming into junction boxes, add supports to restroom exhaust. Stopped inspection-additional items may be noted. | |
| 06/22/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 06/22/2206 Corrections made to prior inspection, walked rest of addition. |