Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/22/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 06/22/2026 Upload revised plans to reflect whole scope of work to include mechanical, electrical, and plumbing and rough-in all at time of inspection. Ensure plumbing and water lines are holding under test and no leaks, rough-in all electrical switches and receptacles along with Romex wires secured within 12" of box and 4.5' intervals. Any penetrations through top and bottom plates must be fire chalked, add Boca nail plates at top and bottom plates to protect ABS pipe within 1.25" to face of plate. Add shower liner and fill with 2" of water at intermediate. All mechanical air registers and exhaust fans need to braced and duct must be terminated outdoors. |