Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2025 | BULD - Electrical Clearance | Partial Pass | 8/20/25 TEP CLEARANCE: DGL, partial pass pending solar. called TEP @ 10:02. |
|
| 08/28/2025 | BULD - Electrical Clearance | Passed | 8.28.25 Tesla Powerwall 3 added to existing system. BAT clearance to TEP. |