Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 137116270


Addresses:

1527 W BREAKWELL ST


Inspection Status: Re-inspection required (with fee)

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-RES-0624-03623

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required (with fee)

Date Description Inspector Results Comments
01/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 1/24/25
All the notes from previous inspections have not been completed. There are also various termite damage through structure, compromised integrity of framing. Stopped inspection...next inspector may add more items. Re-inspection with fee required.
04/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 2 April 25
1. All top plate penetrations or holes must be fire caulked.
2. Boca plates needed throughout
3. Bang plates needed throughout
4. Flex duct must be supported and off Truss.
5. Fire collar is needed on Dryer Vent roof penetrations
6. H2.5 clips needed at all roof joists on the patio roof.
04/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 16 April 25
1. Water hammer arrestor for fridge; laundry and dishwasher.
2. Kinked ductwork marked on ground with.
3. Boca plates needed on top plates, needs to extend 2" below top plate.
04/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Fire foam all penetrations throughout, calk penetrations in vapor barrier. Nail plate or replace damaged stud under window by kitchen, plumbing pipe unfinished. STOPPED INSPECTION, MORE NOTES MAY BE ADDED